Woodside Energy
Pluto LNG Project
Location: Karratha, Western Australia
Date: May 2008 - present
Description: 3D modelling and shop detailing of approximately 7,000 tonnes of modular steel.
Water Disposal Project, HJV Gas Plant Debottlenecking Project, Varanus Gas Expansion Project, John Brookes Onshore Facility Project, Stag Offshore Platform PWD Upgrade
Location: Varanus Island Facility
Date: 2001 - 2008
Description: Site surveys, conceptual studies, preliminary material quantities, supply of all necessary drawings from piping feed studies, design layouts and stress analysis to full traceability detail fabrication drawings & pipe supports.
Adelaide Brighton - Cockburn Cement
Calciner Alternative Fuel System Project Waste Oil Burning Facility Project
Location: Kwinana & Dongara Plants
Date: 2003 – 2008
Description: Site surveys, preliminary mechanical / piping layouts & material quantities, supply of all necessary drawings from design to detail fabrication, construction supervision and project management assistance.
LNG Train V Module 14101
Location: Karratha, Western Australia
Date: 2006
Description: 3D modelling and shop detailing of module 14101, the largest and most complex module for the project.
Otway Gas
Location: South West, Victoria
Date: June 2004 – April 2006
Description: 3D modelling and shop detailing of 1,500 tonnes of structures and piperacks.
Long Lake Project
Location: Fort McMurray, Canada
Date: Late 2004
Description: 3D modelling and shop detailing of approximately 500 tonnes of miscellaneous.
Coomandook & Miakite Gas Compressor Stations
Location: South Australia
Date: 2002 - 2003
Description: Provision of all necessary drawings from preliminary site layouts & material quantities. Mechanical / piping design layouts, stress analysis to fully traceable detail fabrication piping isometrics and pipe support drawings.
Refinery Geelong
Location: Geelong, Australia
Date: 2002
Description: Detailing of 800 tonnes of miscellaneous structures. The full use of 3D engineering models meant no design drawings were produced. All detailing was carried out by direct transfer of 3D Engineering Design Models (PDMS) and 3D StruCad Models. This was completed with embedded information in the models specifying the relevant design criteria.
Millennium Project
Location: Fort McMurray, Canada
Date: 1999 - 2000
Description: Detailing of 11,500 tonnes of piperacks and structures. A close relationship with an international client achieved advanced ordering of materials to improve fabrication schedules. Liaised with the client's construction team for the constructability of pre assembled modular structures to minimise on-site construction activities.
Northern Endeavour Floating Production Storage and Offloading Facility
Location: Fremantle, Western Australia
Date: 1998
Description: Detailing of 10 topsides production modules ranging from 500 to 2000 tonnes. Liaised closely with client on the constructability of the modules so that workshop fabrication was optimised. Electronic transfer of 3D structural models for review by engineering client.
Goodwyn A Drilling Derrick
Location: North West Shelf, off-shore northwest of Dampier, Western Australia
Date: 1990 - present
Description: Shop detailing of the drilling derrick.
North Rankin A Offshore Platform
Location: North West Shelf, off-shore northwest of Dampier, Western Australia
Date: 1983 – present
Description: 3D modelling and shop detailing of miscellaneous structures.
Burrup Peninsula, Trains 1 to 3
Location: Karratha, Western Australia
Date: 1983 – present
Description: Shop detailing of miscellaneous structures.