BHP Billiton Limited
Rapid Growth Project 4 Newman Hub
Location: Newman, Western Australia
Date: December 2007 – August 2008
Description: Shop detailing and 3D modelling of a car dumping facility, a crushing and screening plant, a course ore stock pile, a stockyard facility, a train loadout facility, all interconnecting conveyors and transfer stations plus all associated infrastructure to the existing plant adjacent to the site.
Rio Tinto
Hope Downs – Stage 2
Location: Pilbara region, Western Australia
Date: December 2007 – March 2008
Description: Extension to the existing facilities at Hope Downs with the addition of a primary crusher, secondary crusher, screening building, surge bin and all associated conveyors and transfer stations. PDC completed 3D modelling and shop detailing for all areas in the extension.
Cloudbreak Mine Ore Handling
Location: Pilbara region, Western Australia
Date: July 2007 – March 2008
Description: All mechanical and structural shop detailing and modelling for a screening building with 11 bins and product screens; a crushing building structure including surge and feed bins; a stockpile facility together will all steel and platework; a train loadout facility including all bins and chutes; a desanding facility as well as 11 conveyors and associated transfer stations.
Hope Downs – Stage 1
Location: Pilbara region, Western Australia
Date: July 2007 – January 2008
Description: Mechanical and structural shop detail drawings of in excess of 2,000 tonnes including a primary crusher building, secondary crusher building, screening building, train loadout facility and weigh calibration building.
Rapid Growth Project 4 Car Dumper 2 Upgrade
Location: Port Hedland, Western Australia
Date: September 2006 – June 2007
Description: 3D modelling and detailing of new dump hoppers and support steel; new apron feeders and associated chute work; and conveyor modifications. Detailing also included a new shuttle frame, head chute, transfer chutes, shuttle truss, tramp metal and magnet structure as well as modifications to the existing drive tower.
Dampier Port Upgrade Project
Location: Dampier, Western Australia
Date: April 2004 – July 2007
Description: 3D modelling and shop detailing of jetty wharf extensions, car dumper CD3 building, associated conveyors, transfer stations and piping isometrics.
Rapid Growth Project 3 Expansion of Area C
Location: Pilbara region, Western Australia
Date: July 2005 – June 2007
Description: 3D modelling and shop detail drawings for 6,500 tonnes of steel structures including a primary crusher building, secondary and tertiary crusher building, five bay scalping and screening building, 38 conveyors and associated transfer stations and sample station buildings.
Yandi Expansion Project
Location: Pilbara Region, Western Australia
Date: July 2003 – December 2006
Description: 3D modelling and shop detailing of the primary crushing building, scrubbing and screening building, secondary crushing building, wet plant bypass, sample stations and numerous conveyors and associated conveyors.
Mine Development Project
Location: Pilbara Region, Western Australia
Date: August 2002 - June 2003
Description: Detailing of 5,500 tonnes of heavy mechanical equipment, including LRP screening building conveyors and structures at Finucane Island and primary crusher building, secondary and tertiary crusher building, five bay scalping and screening building, conveyors , associated transfer stations and sample station buildings at Mining Area C.
West Angelas Project
Location: Pilbara Region, Western Australia
Date: 2001
Description: Detailing 2,500 tonnes of heavy mechanical equipment, conveyors and structures.