
Animation & Visualisation
PDC's high resolution rendering utilises detailed 3D models
to provide professional and accurate representations of still images,
as well as animated fly through movie clips. High quality imagery is
utilised early in the engineering design stage of the project to
provide powerful reporting tools for project reporting, corporate and
regulatory presentations and briefings.
Below are a sample of our Projects
where 3D Animations have been recently used. A new window will open and
the video will play when clicked. These are low resolution video files
optimised
for web viewing and are no indication of the final quality high
resolution video and still images that you will receive when dealing
with PDC Consultants.
Lifting Study
Brockman 4 Project
Location: Pilbara, Western Australia
Date: 2008 - 2010
Description: Lifting study animation showing collaboration between design, detailing and lifting planning. IConstruct BIM tools and technology utilised.
Pullwire Isolation Safety Switch
Brockman 4 Project
Location: Pilbara, Western Australia
Date: 2008 - 2010
Description: Pullwire safety demonstration visualisation. Highlighting use of iConstruct BIM tools and technology.
Punmu – Basketball Court
Community Project – Punmu RAWA community
Location: North West, Western Australia
Date: 2009
Description: Visualisation to assist with the approval of the building proposal with local governments and indigenous community.
Chute Maintenance Video / BIM demonstration
Lift including liner change
Location: Western Australia
Date: 2009
Description: Visualisation demonstrating BIM benefits from conceptual design through to operations using PDC’s BIM technology and iConstruct.
Rio Tinto
Brockman 4 Project
Location: Pilbara, Western Australia
Date: 2008 - 2010
Description: 3D BIM modelling and detailing of approximately 4,000 tonnes of structural steel. Scope included engineering construction support.
BHP Billiton Limited
Rapid Growth Project 4 Newman Hub
Location: Newman, Western Australia
Date: December 2007 – August 2008
Description: Shop detailing and 3D modelling of a car dumping facility, a crushing and screening plant, a course ore stock pile, a stockyard facility, a train loadout facility, all interconnecting conveyors and transfer stations plus all associated infrastructure to the existing plant adjacent to the site.
Cloudbreak Mine Ore Handling
Location: Pilbara region, Western Australia
Date: July 2007 – March 2008
Description: All mechanical and structural shop detailing and modelling for a screening building with 11 bins and product screens; a crushing building structure including surge and feed bins; a stockpile facility together will all steel and platework; a train loadout facility including all bins and chutes; a desanding facility as well as 11 conveyors and associated transfer stations.
Rapid Growth Project 3 Expansion of Area C
Location: Pilbara region, Western Australia
Date: July 2005 – June 2007
Description: 3D modelling and shop detail drawings for 6,500 tonnes of steel structures including a primary crusher building, secondary and tertiary crusher building, five bay scalping and screening building, 38 conveyors and associated transfer stations and sample station buildings.
Self Bunded Fuel Storage
Location: Western Australia
Date: July 2010
Description: 3D modelling and animation of Integrated Fuel Services Self Bunded Fuel Tanks.