Brikworks
Location: Forrestfield, Western Australia
Date: November 2007 – April 2008
Description: Design, 3D model and detail truck unloading, crushing building and associated conveyors and transfer stations.
Swire’s Cold Storage Facility
Location: Perth Western Australia
Date: 2007
Description: 3D Modelling and Shop Detailing
Esperance Port Authority Sulphur Storage Facility
Location: Esperance, Western Australia
Date: 2006
Description: Mechanical layouts, 3D modelling and detailing of inloading conveyor system, storage shed and truck loading facilities.
Metro Grain Centre Dehulling Facility
Location: Forrestfield, Western Australia
Date: 2005 - 2006
Description: 3D model, design and detail of inloading conveyors, storage silos and container outloading systems.
European Pneumatic Component Overhaul & Repair BV (EPCOR)
Geneesee Power Generating Station - Phase 3
Location: Edmonton, Alberta, Canada
Date: 2002 - 2003
Description: Detailing of 5,500 tonnes of structural steel for the boiler building. Formed a close relationship with international client and achieved advanced ordering of materials to improve fabrication schedule. Electronic transfer of 3D structural models for review by engineering client.
Esperance Port
Location: Esperance, Western Australia
Date: 2000
Description: Detailing of 1,000 tonnes of mechanical equipment, conveyors and structures. Completion of the mechanical and structural layout of the materials handling process.
Sydney Airport Upgrade
Location: Sydney, New South Wales, Australia
Date: 2000
Description: Detailing of miscellaneous structures for the terminal upgrade.
Perusahaan Umum Listrik Negara
Paiton Power Station, Indonesia
Location: East Java, Indonesia
Date: 1988
Description: Shop detailing of main boiler building.